How to Tile a Shower Floor (Phoenix Homeowner Guide)
Step-by-step guide to building and tiling a shower floor in a Phoenix home, with the rule behind every step: drain, pre-slope, liner, flood test, mortar bed, mosaic tile, grout and flexible corners.
By Gabriel · Licensed Phoenix, Arizona General Contractor ROC 367058 (R-62) · 2026-11-19

A shower floor is the hardest-working tile surface in a house. It is wet every day, it carries your weight, and every drop that gets through the grout has to find its way to the drain instead of into the slab or the wall. When a shower floor fails, it is almost never the tile: it is a flat spot that holds water, a liner that was nailed too low, a clogged weep hole or a drain that was never tested.
Below is the order I follow when I build and tile a shower floor in Phoenix. Every step says why it matters and which rule is behind it: the plumbing chapters of the 2024 International Residential Code (IRC) and the matching sections of the 2024 International Plumbing Code (IPC) for the drain, slope, liner and flood test, the ANSI A108/A118 tile standards and TCNA Handbook shower methods for the mortar bed, tile and grout, and the OSHA silica rule for cutting and cleanup. If you are tiling the walls too, see my guide on how to tile a shower wall; if your floor tile is fine and only the grout is bad, regrouting is a much smaller job.
Tools and parts
- Respirator (N95 minimum, half-face P100 better), safety glasses, hearing protection, knee pads and alkali-resistant gloves
- Hammer drill or rotary hammer with chisel bit, pry bar, HEPA shop vacuum
- Shower drain that matches your method: a two-piece clamping-ring drain with weep holes, or a bonding-flange drain made for a surface membrane
- Shower pan liner (PVC to ASTM D4551 or CPE to ASTM D4068) with corner pieces and solvent, or an ANSI A118.10 sheet or liquid waterproofing membrane
- Bagged floor mud or sand-cement mortar mix, pea gravel or a weep-hole protector, metal or plastic lath for the curb
- 4-foot and 2-foot levels, screed boards or a pre-slope kit, wood float and steel finishing trowel
- Test plug for the drain and a marker for the flood-test water line
- Tile rated for floors (mosaic sheets work best on sloped floors), modified thinset (ANSI A118.4 or A118.15) and the trowel the thinset maker calls for
- Wet tile saw or tile cutter and nippers
- Grout (ANSI A118.7 high-performance cement or A118.3 epoxy), grout float, sponges and buckets
- 100% silicone or other ASTM C920 sealant in a matching color
Step-by-step
Decide what the job is and whether it needs a permit
Retiling over a sound, tested shower pan is finish work. Tearing out the pan, replacing the drain or moving it is plumbing work. Before you start, call the City of Phoenix Planning and Development Department (or your own city) with your exact scope.
Why: Phoenix lists painting, papering and similar finish work as exempt from a building permit, but its plumbing exemptions are narrow: stopping leaks, clearing stoppages and replacing a fixture or valve without relocating anything. Replacing a concealed drain pipe is treated as new work that needs a permit and an inspection, and the shower liner test in step 7 is part of that inspection.
Code: Phoenix PBCC Administrative Provisions Sec. 105.2.1, item 8 (painting, papering and similar finish work exempt) · Phoenix PBCC Administrative Provisions Sec. 105.2.4, items 1-3 (narrow plumbing exemptions; replacing concealed drain pipe is new work)
Tear out the old floor and inspect what is underneath
Plug the drain with a rag and tape, then break out the old tile, mortar bed and liner with a rotary hammer, working wet where you can. Remove the bottom row of wall tile and backer if the old liner runs up behind it. Look at the slab or subfloor, the drain body and the bottom plates of the walls for rot, cracks or old leaks.
Why: Old mortar beds are sand and cement, so chiseling them out makes silica dust. OSHA's silica rule does not allow dry sweeping or compressed air for cleanup where wet methods or HEPA vacuums will work, because both throw the fine dust back into the air. Homeowners are not covered by OSHA, but the dust is just as harmful in a small bathroom.
Code: OSHA 29 CFR 1926.1153(f)(1) (no dry sweeping or brushing of silica dust) · OSHA 29 CFR 1926.1153(f)(2) (no compressed air to clean surfaces)
Check the shower size, entry and drain size
Measure the finished inside of the shower, allowing for the thickness of backer, mortar and tile. Check the opening width where the door or glass will go, and confirm the drain line is at least 1-1/2 inches.
Why: The code sets minimums for a shower so it is usable and drains fast enough: at least 900 square inches of floor area and 30 inches in the smallest direction (with a narrower 25-inch option if the area is at least 1,300 square inches), a clear entry at least 22 inches wide, and a drain outlet at least 1-1/2 inches. It is far easier to fix these now than after the tile is down.
Code: 2024 IRC P2708.1 (Phoenix IPC 421.4) (900 sq in minimum, 30 in minimum dimension) · 2024 IRC P2708.1.1 (Phoenix IPC 421.4.2) (22 in clear opening) · 2024 IRC P2708.2 (1-1/2 in shower drain outlet)
Set the right drain at the right height
For a traditional floor with a liner under the mortar bed, use a clamping-ring drain: the bottom flange sits flush with the pre-slope, the liner is clamped between the flanges, and the weep holes in the clamping ring let water that gets under the tile drain out. For a surface membrane, use the drain that membrane maker specifies. Set the strainer height so the finished tile will end flush with it.
Why: The code requires an approved flanged drain with shower pans and liners, set flush with the subbase and fitted with a clamping ring or similar device that makes a watertight joint with the liner, plus weep holes into the drain. The waste fitting has to be a listed product.
Code: 2024 IRC P2709.4 (flanged drain flush with the subbase, clamping ring, weep holes) · 2024 IRC P2709.4.1 (flanged drains conform to ASME A112.18.2/CSA B125.2)
Build a pre-slope under the liner
Mark a level line around the walls, then float a sand-cement mortar pre-slope from that line down to the drain flange at 1/4 inch per foot. Make it smooth, solid and free of low spots, and let it cure before the liner goes on. Skip this step only if you use a surface membrane method, where the mortar bed itself is sloped and waterproofed on top.
Why: A liner laid flat on a slab holds water under the tile forever, which is what makes old showers smell and turn black at the grout. The code requires the liner to slope 1/4 inch per foot to the weep holes on a smooth, solidly formed subbase. The TCNA traditional shower receptor method (B415) shows the same sloped fill under the liner.
Code: 2024 IRC P2709.3 (Phoenix IPC 421.5.2) (liner sloped 1/4 in per 12 in to weep holes on a smooth, solid subbase) · TCNA Handbook B415 (shower receptor: sloped fill, liner, mortar bed, clamping-ring drain)
Install the liner or waterproofing membrane
Lay the liner over the pre-slope, fold (do not cut) the inside corners, run it up the walls and over the curb, and solvent-weld or seal the seams and corner pieces the way the maker says. Cut the drain bolt holes and drain opening only where the clamping ring goes, set the liner in sealant on the bottom flange, and bolt the ring down. Fasten the liner to the studs or blocking only near the top edge. If you use a surface membrane instead (sheet or liquid), apply it over the sloped mortar bed and up the walls, tied into the drain exactly as that system requires.
Why: The code lists the liner materials allowed (PVC to ASTM D4551, CPE to ASTM D4068, lead, copper, hot-mop or ANSI A118.10 membranes) and requires the liner to turn up at least 2 inches above the finished threshold and 2 inches past the door jambs. It must be recessed so it does not take up the space for the wall finish, and it cannot be nailed or punctured lower than 1 inch above the finished threshold, because any hole below that line sits in water. The TCNA surface membrane methods (B421 and B422) call for the membrane to be continuous from the drain up the walls.
Code: 2024 IRC P2709.2 (Phoenix IPC 421.5.2) (allowed liner materials; 2 in above finished threshold and beyond rough jambs) · 2024 IRC P2709.2.1 (PVC sheets to ASTM D4551, solvent welded) · 2024 IRC P2709.2.4 (liquid membranes to ANSI A118.10) · 2024 IRC P2709.3 (recessed liner; no nails or holes less than 1 in above the finished threshold) · ANSI A118.10 (load-bearing, bonded waterproof membranes) · TCNA Handbook B421 / B422 (surface-applied membrane shower receptors)
Flood-test the pan before any mortar or tile
Plug the drain below the weep holes with a test plug, fill the pan with water to at least 2 inches deep at the curb (build a temporary dam if the curb is lower), mark the water line and leave it. Check the line and the room below or next door for any leak. If the level drops, find and fix the leak and test again.
Why: The code requires every built-up shower liner to be flood tested: drain plugged, water at least 2 inches deep at the threshold, held at least 15 minutes with no leakage. That is the code minimum; I leave mine much longer. A leak found now costs a patch; a leak found after tile costs the whole floor.
Code: 2024 IRC P2503.6 (Phoenix IPC 312.10) (shower liner test: 2 in deep at threshold, at least 15 minutes, no leakage) · 2024 IRC P2709.3 (assembly tested per P2503.6)
Protect the weep holes and float the mortar bed
Put a small handful of pea gravel or a plastic weep protector around the drain so mortar cannot plug the weep holes. Set the drain strainer to final height, then pack a stiff, dry sand-cement mortar bed over the liner, screeded from the wall line down to the drain at the same 1/4 inch per foot. Pack it hard, check for flat spots with a level, and build the curb over lath with its top sloped slightly into the shower.
Why: Water that soaks through grout has to reach the weep holes, so they must stay open. The finished floor has to slope evenly toward the drain at no less than 1/4 inch and no more than 1/2 inch per foot, and a curb has to be 2 to 9 inches deep from its top to the top of the drain. The ANSI standard for tile set in a portland cement mortar bed covers how that bed is mixed and placed.
Code: 2024 IRC P2709.1 (finished floor slope 1/4 to 1/2 in per ft; curb 2 to 9 in deep; flanged watertight drain) · ANSI A108.1A (tile installed in a wet-set portland cement mortar bed) · TCNA Handbook B415 (protect weep holes from mortar)
Choose floor tile and dry-lay the layout
Pick tile made for floors. Small mosaics on mesh sheets bend to follow the four-way slope to the drain and give more grout lines for grip; large tiles on a sloped floor need cuts toward the drain. Dry-lay full sheets from the curb or the most visible edge, and plan the cut pieces around the drain and at the back walls.
Why: The code requires shower floors to have a nonabsorbent surface, and it requires ceramic tile to meet ANSI A137.1, the standard for ceramic tile itself. A good layout keeps cuts small and avoids slivers at the curb, where they break loose first.
Code: 2024 IRC R327.2 (bathtub and shower floors finished with a nonabsorbent surface) · 2024 IRC R702.4.1 (tile installed per ANSI A108 and A118 standards and A137.1)
Cut tile wet and keep tools on GFCI
Cut tile on a wet saw with the water feeding the blade, or score and snap where you can, and nip the small pieces around the drain. Run the saw outdoors or in the garage if possible. Plug the saw and mixer into a GFCI-protected outlet and keep cords out of the shower and the water tray.
Why: OSHA's silica table lists a stationary masonry saw with an integrated water system feeding the blade as the dust control for this kind of cutting. Water and power tools together are why the NEC requires GFCI protection for bathroom receptacles.
Code: OSHA 29 CFR 1926.1153 Table 1 (i) (stationary masonry saws: integrated water delivery to the blade) · 2023 NEC 210.8(A)(1) (GFCI protection for bathroom receptacles)
Set the tile with full mortar coverage
Once the mortar bed is ready to take tile (check the mud and thinset makers' times), mix a modified thinset, key it in with the flat side of the trowel, comb it with the notched side in one direction, and press each sheet in. Beat the sheets in with a flat float so every tile sits in mortar and the surface follows the slope. Pull up a sheet now and then to check coverage, and clean thinset out of the joints before it sets.
Why: The ANSI setting standard requires at least 95% mortar contact in shower installations, with the corners and edges supported, and no tile set into mortar that has skinned over. Voids under shower tile fill with water and keep grout joints dark and wet for days. The IRC points to A108.5 directly.
Code: ANSI A108.5 (setting tile with dry-set or modified mortar; 95% contact in shower installations) · ANSI A118.4 / A118.15 (modified and improved modified dry-set mortars) · 2024 IRC R702.4.1 (tile installed per ANSI A108.5)
Grout the floor
After the thinset cures (usually 24 hours, check the bag), pack grout diagonally across the joints with a rubber float until they are full, scrape off the extra, then shape and clean with a damp, well-wrung sponge. For a shower floor I usually use a high-performance cement grout or epoxy because they stain less. Do not grout the joint where the floor meets the walls or the curb meets the wall.
Why: ANSI A108.10 covers installing grout in tilework and calls for full joints; half-filled joints hold water. The ANSI grout standards set the performance of each grout type: A118.7 for high-performance cement grout and A118.3 for epoxy.
Code: ANSI A108.10 (installation of grout in tilework) · ANSI A118.7 (high-performance cement grouts) · ANSI A118.3 (epoxy grouts)

Seal the corners, then let it cure with the fan running
Once the grout is dry, run 100% silicone or another ASTM C920 sealant in the joint where the floor meets each wall and where the curb meets the walls, and tool it smooth. Keep the shower dry for as long as the grout, thinset and sealant labels say, run the bath fan, and remove the test plug and debris from the drain before the first shower.
Why: Floors and walls move differently, so rigid grout at a change of plane cracks and lets water in. The TCNA movement-joint guideline calls for flexible joints at all inside corners, and ANSI A108.02 says those joints stay clear of setting materials and get sealant after the tile and grout are dry. The IRC requires a bathroom window or exhaust fan vented outdoors, which helps everything cure and keeps steam from feeding mildew.
Code: TCNA Handbook EJ171 (movement joints at all interior changes of plane) · ANSI A108.02 4.4.3 / 4.4.5 (keep movement joints clear; sealant after tile and grout are dry) · ASTM C920 (elastomeric joint sealants) · 2024 IRC R325.2 (bathroom window or exhaust fan vented outdoors)
When to stop and call a licensed pro
- You find rot, mold, a cracked drain line or an old leak when the floor comes out.
- The drain has to move, be replaced or be cut into a slab: that is plumbing work and normally needs a permit.
- Your flood test fails and you cannot find the leak.
- You want a curbless or walk-in shower, which usually means recessing the slab or floor framing.
- The shower is on a second floor or over a finished room, where a leak causes the most damage.
- You want it done once, tested and warrantied, without losing your only shower for a week.
Common questions
How long should I flood test a shower pan?
The code minimum is 15 minutes with at least 2 inches of water at the threshold and no leakage (2024 IRC P2503.6; Phoenix 2024 IPC 312.10). Many installers, me included, leave it much longer, often overnight, because a slow leak may not show in 15 minutes.
How much slope does a shower floor need?
The finished floor must slope evenly toward the drain at no less than 1/4 inch and no more than 1/2 inch per foot (2024 IRC P2709.1). A liner under a mortar bed also needs its own 1/4 inch per foot pre-slope (P2709.3).
Do I need a permit to retile my shower floor in Phoenix?
Replacing tile over a sound pan is finish work, which Phoenix exempts (PBCC Administrative Provisions 105.2.1, item 8). Replacing the pan, liner or drain usually involves concealed drain work, which Phoenix's plumbing exemptions (105.2.4) do not cover. Ask the Planning and Development Department with your exact scope.
What tile is best for a shower floor?
Small mosaics on mesh are the easiest to slope and give more grout lines for grip. Whatever you pick, it must be rated for floors and wet areas, and it gets set with full mortar coverage (ANSI A108.5).
My shower has a window. Does that matter?
Yes. The 2024 IRC treats glass near a bathtub or shower as a hazardous location when its bottom edge is less than 60 inches above the standing surface, so it needs safety glazing (Section R324.4.5), and the sill should be sloped and waterproofed like the rest of the shower.
Want it done right the first time?
I build and tile shower floors, pans, curbs and walls across Phoenix, and I flood-test every pan before a single tile goes down. See my Bathroom and shower tile work in Phoenix, or send a request with the contact form and text me a photo for a fast estimate.